A platform for research: civil engineering, architecture and urbanism
Levee construction along the Mississippi River
Levee construction near Cairo; where flood problem is acute, levee is being raised 3 ft.; dirt is secured from borrow pits, requiring considerable haul; trucks and narrow-gage and standard railway equipment are being used; methods of handling dirt on this job.
Levee construction along the Mississippi River
Levee construction near Cairo; where flood problem is acute, levee is being raised 3 ft.; dirt is secured from borrow pits, requiring considerable haul; trucks and narrow-gage and standard railway equipment are being used; methods of handling dirt on this job.
Levee construction along the Mississippi River
Pub. Works
Hardenbergh, W.A. (author)
Public Works ; 60
1929
3 pages
7 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Mississippi river. Developing new methods of levee construction
Engineering Index Backfile | 1928
Levee construction on Mississippi and its effect on river section
Engineering Index Backfile | 1920
|The Levee theory on the Mississippi River
Engineering Index Backfile | 1903
The Levee theory on the Mississippi River
Engineering Index Backfile | 1903
REGIONAL IMPACTS OF LEVEE CONSTRUCTION AND CHANNELIZATION, MIDDLE MISSISSIPPI RIVER, USA
British Library Conference Proceedings | 2000
|