A platform for research: civil engineering, architecture and urbanism
Foundation problems in erecting standard oil building
Adjoining heavy buildings underpinned down through quicksand. Novel method of cofferdam construction.
Foundation problems in erecting standard oil building
Adjoining heavy buildings underpinned down through quicksand. Novel method of cofferdam construction.
Foundation problems in erecting standard oil building
Eng. News-Rec
Chambers, Ralph H. (author)
1921
4 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Building formwork erecting system and formwork erecting method
European Patent Office | 2023
|Problems with Industry Standard for Erecting Open Web Steel Joists
British Library Conference Proceedings | 2003
|Difficult structural problems in erecting sun life building, Montreal
Engineering Index Backfile | 1931
|