A platform for research: civil engineering, architecture and urbanism
Reconstruction of the bridge over the Duna river near riga by the augsburg-Nurnberg machine factory corpn (MAN) Gustavsburg Works
Girders of two of 8 main spans (nos. V and VII) were completely sunk and it was decided to raise and restore them. Details of reconstruction of different spans, under difficult conditions. (See also - no. 1 Jan. 15 1921 p 1-10)
Reconstruction of the bridge over the Duna river near riga by the augsburg-Nurnberg machine factory corpn (MAN) Gustavsburg Works
Girders of two of 8 main spans (nos. V and VII) were completely sunk and it was decided to raise and restore them. Details of reconstruction of different spans, under difficult conditions. (See also - no. 1 Jan. 15 1921 p 1-10)
Reconstruction of the bridge over the Duna river near riga by the augsburg-Nurnberg machine factory corpn (MAN) Gustavsburg Works
Wiederherstellung der Brucke uber die Duna bei Riga durch die Maschinenfabrik Augsburg-Nurnberg A. G., Werk Gustavsburg
Bauingenieur ; 2
1921
7 pages
34 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Reconstruction of the Duna bridge near riga
Engineering Index Backfile | 1920
|Engineering Index Backfile | 1921
Engineering Index Backfile | 1921
The reconstruction of the Kiel shipyard of the deutsche werke corpn
Engineering Index Backfile | 1924
|TIBKAT | 2005
|