A platform for research: civil engineering, architecture and urbanism
New cantilever bridge begun on the Ohio River
Highway bridge now being built will have channel span of 725 ft. c. to c. of piers, with 375-ft. suspended span carried by 175-ft. cantilever arms, while anchor arms will be 350 ft. long.
New cantilever bridge begun on the Ohio River
Highway bridge now being built will have channel span of 725 ft. c. to c. of piers, with 375-ft. suspended span carried by 175-ft. cantilever arms, while anchor arms will be 350 ft. long.
New cantilever bridge begun on the Ohio River
Eng. News-Rec
1921
1 Fig.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The Sewickley Cantilever Bridge Over the Ohio River
ASCE | 2021
|The Sewickley cantilever bridge over the Ohio River
Engineering Index Backfile | 1912
|Cantilever highway bridge over the Ohio River at Cincinnati
Engineering Index Backfile | 1892
The erection of the double track Mingo Cantilever bridge over the Ohio river
Engineering Index Backfile | 1904
The Pittsburgh and lake Erie cantilever bridge over the Ohio river at Beaver
Engineering Index Backfile | 1911