A platform for research: civil engineering, architecture and urbanism
Design and construction of about 6000 ft of concrete-lined sewer in open cut or as tunnel in rock, about 5.2 ft wide to serve population of 76,000; tunnel survey methods; progress; groundwater leakage; safety measures; costs.
Design and construction of about 6000 ft of concrete-lined sewer in open cut or as tunnel in rock, about 5.2 ft wide to serve population of 76,000; tunnel survey methods; progress; groundwater leakage; safety measures; costs.
Newton high-level sewer
Boston Soc Civ Engrs -- J
Shaw, A.L. (author)
1934
20 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
European Patent Office | 2019
|Engineering Index Backfile | 1964
Split level design for sewer separation
Engineering Index Backfile | 1966
|