A platform for research: civil engineering, architecture and urbanism
Progress in straightening Mississippi by cutoffs
Description of eight new cutoffs between Old River and Arkansas River, by which length of river was shortened by 70 mi; pilot channels are dug with dredges and dragline excavators; river flow used to enlarge pilot channels.
Progress in straightening Mississippi by cutoffs
Description of eight new cutoffs between Old River and Arkansas River, by which length of river was shortened by 70 mi; pilot channels are dug with dredges and dragline excavators; river flow used to enlarge pilot channels.
Progress in straightening Mississippi by cutoffs
Eng News-Rec
Engineering News-Record ; 113
1934
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1947
|Engineering Index Backfile | 1948
|ASCE | 2021
|Mississippi River cutoffs effective
Engineering Index Backfile | 1939
Mississippi River cutoffs effective
Engineering Index Backfile | 1939