A platform for research: civil engineering, architecture and urbanism
Maintenance of Canadian irrigation flume
Failure of Winona galvanized-iron flume, 210 ft long, of Canadian Pacific Railway Co, due to leakage which softened supports and undermined bents; reconstruction of flumes including waterproofing with coating of pitch and tallow which stopped all leakage.
Maintenance of Canadian irrigation flume
Failure of Winona galvanized-iron flume, 210 ft long, of Canadian Pacific Railway Co, due to leakage which softened supports and undermined bents; reconstruction of flumes including waterproofing with coating of pitch and tallow which stopped all leakage.
Maintenance of Canadian irrigation flume
Civ Eng (NY)
Stockton, R.S. (author)
1934
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Precast flume panels -- In Queensland irrigation project
Engineering Index Backfile | 1965
Flume construction on the Medina Valley Irrigation Project
Engineering Index Backfile | 1913
|How inlet transition steps up flow in irrigation flume
Engineering Index Backfile | 1946
|Remodeling of Deteriorated Irrigation Aqueducts Using Precast Polymer Concrete Flume
Tema Archive | 2013
|Remodeling of Deteriorated Irrigation Aqueducts Using Precast Polymer Concrete Flume
Trans Tech Publications | 2013
|