A platform for research: civil engineering, architecture and urbanism
Methods and machines used in building Montgomery locks on Ohio river near beaver, Pa
Construction of tow locks costing $2,000,000; 600 ft long by 110 ft wide and 360 ft long by 56 ft wide, respectively; construction of cofferdam, excavation and backfill; cableways; steel derricks; pumping equipment; concrete plant and forms; electric supply; shops and equipment; labor organization; lighting for night work.
Methods and machines used in building Montgomery locks on Ohio river near beaver, Pa
Construction of tow locks costing $2,000,000; 600 ft long by 110 ft wide and 360 ft long by 56 ft wide, respectively; construction of cofferdam, excavation and backfill; cableways; steel derricks; pumping equipment; concrete plant and forms; electric supply; shops and equipment; labor organization; lighting for night work.
Methods and machines used in building Montgomery locks on Ohio river near beaver, Pa
Contractors Engrs Monthly
1934
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Concrete in Montgomery Island locks
Engineering Index Backfile | 1935
|The Beaver bridge over the Ohio river
Engineering Index Backfile | 1913
|Meldahl locks and dam on Ohio river
Engineering Index Backfile | 1963
|