A platform for research: civil engineering, architecture and urbanism
Three long-span cableways place concrete on Ohio river locks
Construction of inner lock, 110 by 660 ft, and outer lock 56 by 360 ft, separated by common middle wall; three fixed 1500-ft cableways, centered over river, middle and land walls handled excavated material and backfill; steel and concrete; forms are traveling steel gantries; design of cofferdam; derricks supplemented cableways in excavation and pouring of lock sills; roller-gate bucket especially designed for cableway work.
Three long-span cableways place concrete on Ohio river locks
Construction of inner lock, 110 by 660 ft, and outer lock 56 by 360 ft, separated by common middle wall; three fixed 1500-ft cableways, centered over river, middle and land walls handled excavated material and backfill; steel and concrete; forms are traveling steel gantries; design of cofferdam; derricks supplemented cableways in excavation and pouring of lock sills; roller-gate bucket especially designed for cableway work.
Three long-span cableways place concrete on Ohio river locks
Eng News-Rec
Engineering News-Record ; 113
1934
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Three cableways of 1,510-ft. span Place 250,000 yd. of concrete in Montgomery Island locks
Engineering Index Backfile | 1934
Twin cableways of long span place concrete at norris dam
Engineering Index Backfile | 1934
Cableways place hoover dam concrete
Engineering Index Backfile | 1933
|Cableways place concrete in Boulder Dam
Engineering Index Backfile | 1934
Demountable cableways place concrete at Norris dam
Engineering Index Backfile | 1934