A platform for research: civil engineering, architecture and urbanism
Lock concreting at rock island dam
Methods of concrete construction used in building locks at Rock Island dam on Upper Mississippi, occupying area of 17 acres, including 1 mi of walls 26 ft high; new designs of cofferdams; compaction of concrete by vibration.
Lock concreting at rock island dam
Methods of concrete construction used in building locks at Rock Island dam on Upper Mississippi, occupying area of 17 acres, including 1 mi of walls 26 ft high; new designs of cofferdams; compaction of concrete by vibration.
Lock concreting at rock island dam
Eng News-Rec
Engineering News-Record ; 112
1934
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Belt concreting at Wards Island
Engineering Index Backfile | 1932
Concreting of north lock structures in bremerhaven
Engineering Index Backfile | 1931
|Concreting of north lock structures in bremerhaven
Engineering Index Backfile | 1931
|