A platform for research: civil engineering, architecture and urbanism
Concreting of north lock structures in bremerhaven
Methods of placing 253,000 cu. m. of massive concrete in canal locks, power houses, bridge abutments, etc., operations extending over period of nearly 3 yr.; results of field tests of concrete; placing steel reinforcement, seawall anchors, construction of expansion joints, etc. (see also similar article in Zement, vol. 20, nos. 42 and 43, Oct. 15, 1931, pp. 922-926 and Oct. 22, pp. 943-945, 9 figs.)
Concreting of north lock structures in bremerhaven
Methods of placing 253,000 cu. m. of massive concrete in canal locks, power houses, bridge abutments, etc., operations extending over period of nearly 3 yr.; results of field tests of concrete; placing steel reinforcement, seawall anchors, construction of expansion joints, etc. (see also similar article in Zement, vol. 20, nos. 42 and 43, Oct. 15, 1931, pp. 922-926 and Oct. 22, pp. 943-945, 9 figs.)
Concreting of north lock structures in bremerhaven
Die Betonierung der Bauwerke fuer die Nordschleusenanlage in Bremerhaven
Martinsen, O. (author)
Bautechnik ; 9
1931
11 pages
28 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Concreting of north lock structures in bremerhaven
Engineering Index Backfile | 1931
|Concreting plant in construction of northern locks at bremerhaven
Engineering Index Backfile | 1931
|Gates of new North Sea lock at Bremerhaven
Engineering Index Backfile | 1929
|Lock concreting at rock island dam
Engineering Index Backfile | 1934