A platform for research: civil engineering, architecture and urbanism
Cantilever steel erection on Caughnawaga bridge
Bridge of deck-truss type with continuous tied arch near south end; use of erection saddles over piers permit deck traveler to place 235-ft deck spans without falsework; erection of 400-ft arch span completed in 3 weeks in sub-zero weather.
Cantilever steel erection on Caughnawaga bridge
Bridge of deck-truss type with continuous tied arch near south end; use of erection saddles over piers permit deck traveler to place 235-ft deck spans without falsework; erection of 400-ft arch span completed in 3 weeks in sub-zero weather.
Cantilever steel erection on Caughnawaga bridge
Eng News-Rec
Engineering News-Record ; 112
1934
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Cantilever erection of Truss bridge
Engineering Index Backfile | 1931
|Erection of the Forth cantilever bridge
Engineering Index Backfile | 1887
|Cable-stayed bridge warren steel truss cantilever erection method
European Patent Office | 2016
|Erection of the Forth cantilever bridge
Engineering Index Backfile | 1887
|Erection of the Forth cantilever bridge
Engineering Index Backfile | 1887