A platform for research: civil engineering, architecture and urbanism
Cantilever erection of Truss bridge
Methods used in erection of 440-ft. through-truss channel span and two-span continuous trusses of Santa Fe River Bridge, crossing Illinois River at Chillicothe, Ill.; part of top chord of old swing span removed to clear bottom of new fixed span; channel span was cantilevered 176 ft. from steel bent on piling to temporary bent on pier of old bridge.
Cantilever erection of Truss bridge
Methods used in erection of 440-ft. through-truss channel span and two-span continuous trusses of Santa Fe River Bridge, crossing Illinois River at Chillicothe, Ill.; part of top chord of old swing span removed to clear bottom of new fixed span; channel span was cantilevered 176 ft. from steel bent on piling to temporary bent on pier of old bridge.
Cantilever erection of Truss bridge
Eng. News- Rec
Crider, H.E. (author) / Neyenesch, H.G. (author)
Engineering News-Record ; 107
1931
4 pages
5 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Cable-stayed bridge warren steel truss cantilever erection method
European Patent Office | 2016
|European Patent Office | 2024
|Cantilever steel erection on Caughnawaga bridge
Engineering Index Backfile | 1934
Erection of the Forth cantilever bridge
Engineering Index Backfile | 1887
|Erection of the Forth cantilever bridge
Engineering Index Backfile | 1887
|