A platform for research: civil engineering, architecture and urbanism
Die erste vollstaendig geschweisste Bogenbruecke
Description of longest European all-welded steel-arch bridge, near Pilsen, Czechoslovakia; consisting of two 2-hinged-arch ribs spaced 20 ft 8 in. apart having rise of 35 ft; total width of structure is 29 1/2 ft; all welds made continuous; about 6 mi of bare and covered electrodes were consumed; weight of steel structure is 110 tons. (see also English abstract in Eng News-Rec v 113 n 19 Nov 8 1934 p 593)
Die erste vollstaendig geschweisste Bogenbruecke
Description of longest European all-welded steel-arch bridge, near Pilsen, Czechoslovakia; consisting of two 2-hinged-arch ribs spaced 20 ft 8 in. apart having rise of 35 ft; total width of structure is 29 1/2 ft; all welds made continuous; about 6 mi of bare and covered electrodes were consumed; weight of steel structure is 110 tons. (see also English abstract in Eng News-Rec v 113 n 19 Nov 8 1934 p 593)
Die erste vollstaendig geschweisste Bogenbruecke
Die erste vollstaendig geschweisste Bogenbruecke
Faltus, F. (author)
1934
2 pages
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Eine vollstaendig geschweisste Bogenbruecke in Pilsen
Engineering Index Backfile | 1935
|Eine vollstaendig geschweisste Bogenbruecke in Pilsen
Engineering Index Backfile | 1934
|Betonoptik vollstaendig reprofiliert
British Library Online Contents | 1996
|Ein vollstaendig geschweisster Fabrikbau
Engineering Index Backfile | 1935
|Wiley | 2012
|