A platform for research: civil engineering, architecture and urbanism
Loading tests on steel deck plate girder bridge with integral concrete floor
Test of bridge consisting of central I-beam span 70 ft long, to determine degree of monolithic action under load, when steel girder beams are employed in connection with reinforced-concrete deck integrally connected by suitable connection types, rigidly connected to steel girders and extending upward into concrete deck.
Loading tests on steel deck plate girder bridge with integral concrete floor
Test of bridge consisting of central I-beam span 70 ft long, to determine degree of monolithic action under load, when steel girder beams are employed in connection with reinforced-concrete deck integrally connected by suitable connection types, rigidly connected to steel girders and extending upward into concrete deck.
Loading tests on steel deck plate girder bridge with integral concrete floor
Ore State Highway Commission -- Highway Dept -- Tech Bul
1934
27 pages
Report
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Fire of Steel Plate Girder Bridge with An Orthotropic Deck
British Library Conference Proceedings | 2016
|Steel truss girder bridge floor and steel truss girder bridge
European Patent Office | 2022
|Steel box girder bridge deck integral lifting structure and mounting method
European Patent Office | 2024
|