A platform for research: civil engineering, architecture and urbanism
Details of method developed by City Electric Works Co. of Berlin (Bewag); use of trench excavators and plows and their performance; time studies.
Details of method developed by City Electric Works Co. of Berlin (Bewag); use of trench excavators and plows and their performance; time studies.
Modern cable-laying practice
Moderne Arbeitsmethoden bei der Kabelverlegung
von Wiarda, E. (author)
1929
6 pages
12 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.