A platform for research: civil engineering, architecture and urbanism
Report on the proposed heightening of the Aswan dam
Examination of existing structure; modification to selected design; dam can be raised second time but third raising is impracticable, and it would therefore be better to make second heightening such that quantity of water impounded would assure maximum possible supply.
Report on the proposed heightening of the Aswan dam
Examination of existing structure; modification to selected design; dam can be raised second time but third raising is impracticable, and it would therefore be better to make second heightening such that quantity of water impounded would assure maximum possible supply.
Report on the proposed heightening of the Aswan dam
Water Water Eng
Binnie, W.J.E. (author) / Cooper, H.L. (author) / Gruener, H.E. (author)
1929
6 pages
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Report on the proposed heightening of the Aswan dam
Engineering Index Backfile | 1929
Engineering Index Backfile | 1945
Engineering Index Backfile | 1933