A platform for research: civil engineering, architecture and urbanism
Heightening of Aswan Dam
In 1912 first heightening, which brought capacity up 2400 million cu m was completed; work on second heightening begun in Nov 1929; various phases of work of raising dam; reconstruction of lock system; costs.
Heightening of Aswan Dam
In 1912 first heightening, which brought capacity up 2400 million cu m was completed; work on second heightening begun in Nov 1929; various phases of work of raising dam; reconstruction of lock system; costs.
Heightening of Aswan Dam
Eng
Engineer ; 155
1933
4 pages
Supp plates
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1945
Report on the proposed heightening of the Aswan dam
Engineering Index Backfile | 1929
Report on the proposed heightening of the Aswan dam
Engineering Index Backfile | 1929
|