A platform for research: civil engineering, architecture and urbanism
Pipe braces used to hold form panels on concrete dam construction
Successful method of holding concrete form panels in perfect alignent, developed on Exchequer dam and later used on Hetch Hetchy dam, involves use of iron pipe braces wedged against panels from inside, replacing customary wood braces.
Pipe braces used to hold form panels on concrete dam construction
Successful method of holding concrete form panels in perfect alignent, developed on Exchequer dam and later used on Hetch Hetchy dam, involves use of iron pipe braces wedged against panels from inside, replacing customary wood braces.
Pipe braces used to hold form panels on concrete dam construction
Eng. News-Rec
McFarland, D. (author)
Engineering News Record ; 102
1929
2 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Stiffening Requirements for Unbonded Braces Encased in Concrete Panels
British Library Online Contents | 2001
|Stiffening Requirements for Unbonded Braces Encased in Concrete Panels
Online Contents | 2001
|European Patent Office | 2019
|Steel braces hold high clay bank in Albany
Engineering Index Backfile | 1950
|