A platform for research: civil engineering, architecture and urbanism
Steel braces hold high clay bank in Albany
Bank, 40 ft above excavation line, supported partly by old retaining wall created serious problem in foundation of building for Albany Times-Union; illustrated description of excavation, removal of retaining wall, pile driving, and steel bracing.
Steel braces hold high clay bank in Albany
Bank, 40 ft above excavation line, supported partly by old retaining wall created serious problem in foundation of building for Albany Times-Union; illustrated description of excavation, removal of retaining wall, pile driving, and steel bracing.
Steel braces hold high clay bank in Albany
Eng News-Rec
Spencer, C.B. (author)
Engineering News-Record ; 144
1950
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Pipe braces used to hold form panels on concrete dam construction
Engineering Index Backfile | 1929
|Seismic Retrofitting of Steel Frames: Ordinary Braces vs. Mega-Braces
British Library Conference Proceedings | 2003
|Heavy shoring braces earth bank during construction of wall
Engineering Index Backfile | 1930
|Arch Braces or Tension Braces?
British Library Online Contents | 1997
|