A platform for research: civil engineering, architecture and urbanism
Culvert jacked under railroad
Description of operations using 50-ton ratchet jack to force 30-in. corrugated iron culvert through base of railroad embankment at saving of $1030 on $21,000 job.
Culvert jacked under railroad
Description of operations using 50-ton ratchet jack to force 30-in. corrugated iron culvert through base of railroad embankment at saving of $1030 on $21,000 job.
Culvert jacked under railroad
Constructor
Constructor ; 11
1929
2 pages
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Record length of pipe culvert jacked through embankment
Engineering Index Backfile | 1940
Railroad girder spans jacked into place
Engineering Index Backfile | 1941
|Design and Construction of a Jacked Box Culvert in Quincy, Massachusetts
British Library Conference Proceedings | 2013
|Culvert pipe 105-ft. long is jacked through 47-ft. fill
Engineering Index Backfile | 1926
|Culvert jacked through solid rock ledge by West Virginia maintenance crew
Engineering Index Backfile | 1928
|