A platform for research: civil engineering, architecture and urbanism
Construction of two deck-girder spans for underpass on relocation of U S Highway 30, west of Cheyenne, Wyo, built on falsework alongside tracks and jacked into place between passage of trains; falsework and jacking arrangements.
Construction of two deck-girder spans for underpass on relocation of U S Highway 30, west of Cheyenne, Wyo, built on falsework alongside tracks and jacked into place between passage of trains; falsework and jacking arrangements.
Railroad girder spans jacked into place
Eng News-Rec
Carr, J.R. (author)
Engineering News-Record ; 126
1941
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1929
Relocated girder spans take place of trusses in this long bridge
Engineering Index Backfile | 1965
Box-girder bridge with 130-ft spans
Engineering Index Backfile | 1940
|Long girder spans for reinforced concrete bridge
Engineering Index Backfile | 1924
The erection of large plate girder spans
Engineering Index Backfile | 1899
|