A platform for research: civil engineering, architecture and urbanism
Bridge built at Remic Rapids as part of scheme for beautification of Ottawa consists of 22 plate-girder spans 70 ft. each, and four spans of 125 ft., carried on reinforced-concrete pier faced with precast artificial stone; typical elevation and plan of 125-ft. span, piers and abutments.
Bridge built at Remic Rapids as part of scheme for beautification of Ottawa consists of 22 plate-girder spans 70 ft. each, and four spans of 125 ft., carried on reinforced-concrete pier faced with precast artificial stone; typical elevation and plan of 125-ft. span, piers and abutments.
Champlain bridge over Ottawa river
Can. Engr
Hay, A.K. (author)
Canadian Engineer ; 56
1929
4 pages
10 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The Champlain Bridge over the Ottawa River
Engineering Index Backfile | 1928
|Engineering Index Backfile | 1932
|Billings bridge over Rideau River, Ottawa
Engineering Index Backfile | 1915
Billings Bridge over Rideau River, Ottawa
Engineering Index Backfile | 1919
|Billings Bridge over Rideau River, Ottawa
Engineering Index Backfile | 1919
|