A platform for research: civil engineering, architecture and urbanism
Long structure linking Ontario and Quebec shores completed after five years' work; part of Federal District Commission's plans for improvement of Ottawa district; piers built during severe winter weather; general type of construction used is made up of deck-plate girder spans, each consisting of pair of girder supporting steel floor beam and stringer construction on which rests concrete floor slab; width of roadway is 24 ft. and sidewalks 5 1/2 ft. each; new portion of bridge is 2040 ft. long; terminal features.
Long structure linking Ontario and Quebec shores completed after five years' work; part of Federal District Commission's plans for improvement of Ottawa district; piers built during severe winter weather; general type of construction used is made up of deck-plate girder spans, each consisting of pair of girder supporting steel floor beam and stringer construction on which rests concrete floor slab; width of roadway is 24 ft. and sidewalks 5 1/2 ft. each; new portion of bridge is 2040 ft. long; terminal features.
The Champlain Bridge over the Ottawa River
Contract Rec
Hay, A.K. (author)
1928
5 pages
9 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Champlain bridge over Ottawa river
Engineering Index Backfile | 1929
|Engineering Index Backfile | 1932
|Billings bridge over Rideau River, Ottawa
Engineering Index Backfile | 1915
Billings Bridge over Rideau River, Ottawa
Engineering Index Backfile | 1919
|Billings Bridge over Rideau River, Ottawa
Engineering Index Backfile | 1919
|