A platform for research: civil engineering, architecture and urbanism
Completion of Wearmouth Bridge
Formal opening by Duke of York; origin of bridge; new bridge has span of 375 ft., and two main arch members are three-pinned type; width of bridge 80 ft., roadway 58 ft. and foot paths 15 ft. 9 in., clear height for shipping has been increased to 85 ft. 6 in. above high water; constructional methods; road and foot path.
Completion of Wearmouth Bridge
Formal opening by Duke of York; origin of bridge; new bridge has span of 375 ft., and two main arch members are three-pinned type; width of bridge 80 ft., roadway 58 ft. and foot paths 15 ft. 9 in., clear height for shipping has been increased to 85 ft. 6 in. above high water; constructional methods; road and foot path.
Completion of Wearmouth Bridge
Modern Transport
Modern Transport ; 22
1929
2 pages
4 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The new Wearmouth bridge, Sunderland
Engineering Index Backfile | 1930
|New wearmouth bridge, sunderland
Engineering Index Backfile | 1930
|The reconstruction of the Wearmouth bridge, Sunderland
Engineering Index Backfile | 1929