A platform for research: civil engineering, architecture and urbanism
Precast units expedite fabrication of 7-mile concrete trestle
Raymond Concrete Pile Co., general contractor for highway toll bridge across San Francisco Bay, between San Mateo and Mt. Eden, accelerated construction by use of precast units for piles, slabs, and railing of concrete trestle portion, almost 7 mi. in length; trestle design; slab and pile casting yards; driving piles; placing slabs.
Precast units expedite fabrication of 7-mile concrete trestle
Raymond Concrete Pile Co., general contractor for highway toll bridge across San Francisco Bay, between San Mateo and Mt. Eden, accelerated construction by use of precast units for piles, slabs, and railing of concrete trestle portion, almost 7 mi. in length; trestle design; slab and pile casting yards; driving piles; placing slabs.
Precast units expedite fabrication of 7-mile concrete trestle
Construction Methods
Construction Methods ; 11
1929
5 pages
14 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Long concrete trestle of precast units
Engineering Index Backfile | 1928
Building concrete precast pile trestle
Engineering Index Backfile | 1947
Concrete trestle construction with precast piles and slabs
Engineering Index Backfile | 1929
|Use of Precast Concrete to Expedite Industrial Construction
British Library Conference Proceedings | 2008
|