A platform for research: civil engineering, architecture and urbanism
Description of concrete toll bridge across bay below San Francisco which is made up almost entirely of precast units; girders and decking combined were precast in half sections, weighing as much as 55 tons each; four pile bents capped on site and when caps were sufficiently hardened, precast deck slabs were placed approximately in position; plant where concrete piles and precast slabs were made.
Description of concrete toll bridge across bay below San Francisco which is made up almost entirely of precast units; girders and decking combined were precast in half sections, weighing as much as 55 tons each; four pile bents capped on site and when caps were sufficiently hardened, precast deck slabs were placed approximately in position; plant where concrete piles and precast slabs were made.
Pre-cast seven mile bridge
Sci. Am
Geiger, C.W. (author)
Scientific American ; 140
1929
3 pages
7 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The seven-mile (Nanango) goldfield
Engineering Index Backfile | 1906
|San Angelo dam -- Seven-mile earthfill
Engineering Index Backfile | 1950
Seven-mile El Mirador tunnel in Mexico
Engineering Index Backfile | 1946
Building a seven-mile railroad in 32 days' time
Engineering Index Backfile | 1918
Two-mile bridge creeps across St. Lawrence
Engineering Index Backfile | 1928
|