A platform for research: civil engineering, architecture and urbanism
Jan n 1 p 5-14: Article describes further progress in construction of bridge at Plougastel-Daoulas; piers in river; North abutment; construction of arch centering. Mar n 3 p 165-176: Construction of concrete pontoons; completion of arch centering; floating of centering and raising it into position for concreting permanent arch; concreting of 600-ft. arch rib; transporting centering from first to second span.
Jan n 1 p 5-14: Article describes further progress in construction of bridge at Plougastel-Daoulas; piers in river; North abutment; construction of arch centering. Mar n 3 p 165-176: Construction of concrete pontoons; completion of arch centering; floating of centering and raising it into position for concreting permanent arch; concreting of 600-ft. arch rib; transporting centering from first to second span.
The Elorn Bridge, Brest
Concrete Constr. Eng
Turner, L. (author)
1929
15 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Reinforced concrete bridge at elorn, brest
Engineering Index Backfile | 1926
|Reinforced concrete bridge over the Elorn, Brest
Engineering Index Backfile | 1928
|The new bridge over Elom in Brest. Divers auteurs
Online Contents | 1994
Bridge across Moulin a Poudre valley at Brest
Engineering Index Backfile | 1966
|