A platform for research: civil engineering, architecture and urbanism
High rock unloading record on Long Beach breakwater
Unloading record for single shovel in eight-hour period was 60 cars and best eight-hour record for two shovels on job was 102 cars.
High rock unloading record on Long Beach breakwater
Unloading record for single shovel in eight-hour period was 60 cars and best eight-hour record for two shovels on job was 102 cars.
High rock unloading record on Long Beach breakwater
Eng. News-Rec
Engineering News Record ; 102
1928
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Long Beach-Los Angeles harbor breakwater
Engineering Index Backfile | 1933
|ECONOMIC ANALYSIS OF RECONFIGURING THE LONG BEACH BREAKWATER
British Library Online Contents | 2011
|Los Angeles-Long Beach harbors breakwater result of long planning
Engineering Index Backfile | 1946
|Creosoted timber mat seals breakwater in Long Beach Harbor
Engineering Index Backfile | 1932
Colonial Beach, Virginia, Detached Breakwater Project
NTIS | 1989
|