A platform for research: civil engineering, architecture and urbanism
Development of the asbestos industry in Quebec
Historical note of discovery; mining began in 1878 and production was 50 tons; rapid development during 12 years; mechanical treatment of mine product; data concerning large producers and men prominent in asbestos industry; 1928 production was 295,821 tons, valued at $11,251,830; 5,159,247 tons rock mined, of which 4,109,823 tons were milled; average value of rock mined was $2.17 per ton. (50th anniversary no)
Development of the asbestos industry in Quebec
Historical note of discovery; mining began in 1878 and production was 50 tons; rapid development during 12 years; mechanical treatment of mine product; data concerning large producers and men prominent in asbestos industry; 1928 production was 295,821 tons, valued at $11,251,830; 5,159,247 tons rock mined, of which 4,109,823 tons were milled; average value of rock mined was $2.17 per ton. (50th anniversary no)
Development of the asbestos industry in Quebec
Can. Min. Jl.,
Ross, J.G. (author)
1929
4 pages
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Quebec asbestos industry testing and quality control
Engineering Index Backfile | 1962
|Lake asbestos of Quebec operations
Engineering Index Backfile | 1958
Asbestos occurrences in Southern Quebec
Engineering Index Backfile | 1931
|Lake asbestos of Quebec operations
Engineering Index Backfile | 1958
Asbestos mining and milling in Quebec RuKeyser
Engineering Index Backfile | 1922
|