A platform for research: civil engineering, architecture and urbanism
Assiut barrage remodelling
Illustrated description of work completed on Nile River; remodeling consisted of strengthening and widening cast wall of lock, lengthening concrete floors of lock, and providing new concrete floor on river side; dam is 800 m long; details of interlocking reinforced concrete sheet piles and steel piling, new sluice gates and grooves, construction of sudds, etc.
Assiut barrage remodelling
Illustrated description of work completed on Nile River; remodeling consisted of strengthening and widening cast wall of lock, lengthening concrete floors of lock, and providing new concrete floor on river side; dam is 800 m long; details of interlocking reinforced concrete sheet piles and steel piling, new sluice gates and grooves, construction of sudds, etc.
Assiut barrage remodelling
Engineer
Engineer ; 166
1938
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1938
Remodelling of Assiut Barrage, Egypt
Engineering Index Backfile | 1940
|Remodelling of Assiut Barrage, Egypt
Engineering Index Backfile | 1941
|Remodelling of Assiut Barrage, Egypt
Engineering Index Backfile | 1940
|Assiut Barrage, to rehabilitate or to rebuild
British Library Conference Proceedings | 2006
|