A platform for research: civil engineering, architecture and urbanism
Methods and equipment used in raising height of Assiut sluice gate masonry dam in Egypt by 4.2 m; remodeling of Ibrahimia regulator; new construction included: strengthening west wall of lock, floor extension, repairs to old lock gates and flushing sluices, grouting under new foundations and existing work, flexible concrete block aprons, cast iron wearing plates, weirs downstream of barrage, pier extensions, etc. (Abstract) (See also - discussion p 330-44 Supp plates and discussion Oct p 572-8; Civ Eng (Lond) v 35 n 407 May 1940 p 139-41)
Methods and equipment used in raising height of Assiut sluice gate masonry dam in Egypt by 4.2 m; remodeling of Ibrahimia regulator; new construction included: strengthening west wall of lock, floor extension, repairs to old lock gates and flushing sluices, grouting under new foundations and existing work, flexible concrete block aprons, cast iron wearing plates, weirs downstream of barrage, pier extensions, etc. (Abstract) (See also - discussion p 330-44 Supp plates and discussion Oct p 572-8; Civ Eng (Lond) v 35 n 407 May 1940 p 139-41)
Remodelling of Assiut Barrage, Egypt
Instn Civ Engrs -- J
Bostock, J.E. (author)
1940
29 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Remodelling of Assiut Barrage, Egypt
Engineering Index Backfile | 1940
|Remodelling of Assiut Barrage, Egypt
Engineering Index Backfile | 1941
|Engineering Index Backfile | 1938
Engineering Index Backfile | 1938
Remodelling of Esna Barrage, Egypt
Engineering Index Backfile | 1944