A platform for research: civil engineering, architecture and urbanism
Wembley park track rearrangement and signalling
Rearrangement of London Transport tracks to eliminate congestion; scheme involved reducing capacity of adjacent car sheds, widening 300 yd of embankment, constructing new double line span bridge and providing 1/2 mi length of new double track, and alterations to connections, signaling, and power cables.
Wembley park track rearrangement and signalling
Rearrangement of London Transport tracks to eliminate congestion; scheme involved reducing capacity of adjacent car sheds, widening 300 yd of embankment, constructing new double line span bridge and providing 1/2 mi length of new double track, and alterations to connections, signaling, and power cables.
Wembley park track rearrangement and signalling
Engineer
Engineer ; 198
1954
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1923
Engineering Index Backfile | 1923
LONDON FOCUS - Fever pitch at Wembley Park
Online Contents | 2004
LONDON SPECIAL - Wembley Park ready for the crowds
Online Contents | 2005
Wembley stadium The big match between Wembley and the politicians
British Library Online Contents | 2001