A platform for research: civil engineering, architecture and urbanism
Speedy shaft construction
Use of precast reinforced concrete slabs for building 6 in. 37 ft wall during nine shifts; slab design, building wall, and sealing wall.
Speedy shaft construction
Use of precast reinforced concrete slabs for building 6 in. 37 ft wall during nine shifts; slab design, building wall, and sealing wall.
Speedy shaft construction
Coal Age
Coal Age ; 59
1954
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Speedy construction of airfields
Engineering Index Backfile | 1945
Speedy concrete floor construction in winter
Engineering Index Backfile | 1928
Speedy and Economical Construction through Mechanization
ASCE | 2021
|Power-house design for speedy construction
Engineering Index Backfile | 1965
|British Library Online Contents | 2004