A platform for research: civil engineering, architecture and urbanism
Tough terrain conquered by builders of West Virginia turnpike
Turnpike, 88 mi long, with grades of 5%, required tunnel, 2664 ft long, 30 ft high, 33 ft wide; it is solid rock bore through sandstones and shales and will be fully lined with concrete; roadway lane is 24 ft wide with additional two 9-ft shoulders.
Tough terrain conquered by builders of West Virginia turnpike
Turnpike, 88 mi long, with grades of 5%, required tunnel, 2664 ft long, 30 ft high, 33 ft wide; it is solid rock bore through sandstones and shales and will be fully lined with concrete; roadway lane is 24 ft wide with additional two 9-ft shoulders.
Tough terrain conquered by builders of West Virginia turnpike
Civ Eng (NY)
Peterson, C.H. (author)
1954
7 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Bridges on West Virginia Turnpike
Engineering Index Backfile | 1953
|Bridges on the West Virginia Turnpike
ASCE | 2021
|Using creeper lanes for trucks on West Virginia Turnpike
Engineering Index Backfile | 1957
|British Library Online Contents | 2012