A platform for research: civil engineering, architecture and urbanism
Comparison of shooting and mucking methods and costs on two tunnels in Springfield's new water supply and hydroelectric project; diversion tunnel 11 1/2 by 11 1/2-ft. horeshoe section 1550 ft. long; pressure tunnel has total length of 7080 ft. and is mainly 10 by 9 ft. 4 in. horseshoe section, concrete lined; drilling and shooting schedules for various tunneling methods; various heading and bench methods tried; shooting diagram; costs.
Comparison of shooting and mucking methods and costs on two tunnels in Springfield's new water supply and hydroelectric project; diversion tunnel 11 1/2 by 11 1/2-ft. horeshoe section 1550 ft. long; pressure tunnel has total length of 7080 ft. and is mainly 10 by 9 ft. 4 in. horseshoe section, concrete lined; drilling and shooting schedules for various tunneling methods; various heading and bench methods tried; shooting diagram; costs.
Tunnel driving at cobble mountain
Eng. News-Rec
Hatch, H.H. (author)
Engineering News-Record ; 107
1931
5 pages
5 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1934
|Tunnel grouting at Cobble Mountain
Engineering Index Backfile | 1932
|Tunnel blasting at cobble mountain
Engineering Index Backfile | 1930
|Tunnel blasting at cobble mountain
Engineering Index Backfile | 1930
|Construction of Cobble Mountain diversion tunnel
Engineering Index Backfile | 1933
|