A platform for research: civil engineering, architecture and urbanism
Construction of Cobble Mountain diversion tunnel
Construction of Springfield, Mass, waterworks and power supply tunnel 1550 ft long, having horseshoe cross section 11 ft 6 in. high and 11 ft 6-in. wide; driving tunnel; drilling and shooting schedule for tunnel; heading and bench methods; methods of sinking and raising shaft; lining and grouting tunnel; cost of grouting; tunnel appurtenances; cost data.
Construction of Cobble Mountain diversion tunnel
Construction of Springfield, Mass, waterworks and power supply tunnel 1550 ft long, having horseshoe cross section 11 ft 6 in. high and 11 ft 6-in. wide; driving tunnel; drilling and shooting schedule for tunnel; heading and bench methods; methods of sinking and raising shaft; lining and grouting tunnel; cost of grouting; tunnel appurtenances; cost data.
Construction of Cobble Mountain diversion tunnel
New England Water Works Assn -- J
Hatch, H.H. (author)
1933
20 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1934
|Tunnel driving at cobble mountain
Engineering Index Backfile | 1931
|Tunnel grouting at Cobble Mountain
Engineering Index Backfile | 1932
|Tunnel blasting at cobble mountain
Engineering Index Backfile | 1930
|Tunnel blasting at cobble mountain
Engineering Index Backfile | 1930
|