A platform for research: civil engineering, architecture and urbanism
Reconstruction of portion of Mabton pressure pipe, Sunnyside division, Yakima project, Washington
Construction of 3/8-in. riveted plate-steel pipe line, 60 in. internal diam. and 518 ft. long over Yakima River, supported by 13 rock-filled timber piers.
Reconstruction of portion of Mabton pressure pipe, Sunnyside division, Yakima project, Washington
Construction of 3/8-in. riveted plate-steel pipe line, 60 in. internal diam. and 518 ft. long over Yakima River, supported by 13 rock-filled timber piers.
Reconstruction of portion of Mabton pressure pipe, Sunnyside division, Yakima project, Washington
New Reclamation Era
Ball, D.E. (author)
New Reclamation Era ; 22
1931
3 pages
2 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Easton dam, Yakima project, Washington
Engineering Index Backfile | 1931
|Cle Elum dam, Yakima project, Washington
Engineering Index Backfile | 1931
Construction of main canal lining in kittitas division, Yakima reclamation project, Washington
Engineering Index Backfile | 1930
|Construction of main canal lining on kittitas division\ill\ Yakima reclamation project, Washington
Engineering Index Backfile | 1931
|