A platform for research: civil engineering, architecture and urbanism
Chicago's new diagonal thoroughfare
Completion of 3/4 mi. link costing $5,500,000 will close last gap in 12-mi. avenue leading to lakefront; viaduct includes steel and reinforced concrete construction and has two bascule bridges; future grade separation; details of reinforced-concrete. and of steel viaducts, retaining walls, fills, etc.
Chicago's new diagonal thoroughfare
Completion of 3/4 mi. link costing $5,500,000 will close last gap in 12-mi. avenue leading to lakefront; viaduct includes steel and reinforced concrete construction and has two bascule bridges; future grade separation; details of reinforced-concrete. and of steel viaducts, retaining walls, fills, etc.
Chicago's new diagonal thoroughfare
Eng. News-Rec.
Engineering News-Record ; 107
1931
5 pages
8 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
New type of thoroughfare: "Freeway"
Engineering Index Backfile | 1932
|Bibliography On Street Thoroughfare
ASCE | 2021
Dyersburg Thoroughfare Plan Report 3
NTIS | 1969
Major Thoroughfare Plan, Richmond, Kentucky
NTIS | 1969
|