A platform for research: civil engineering, architecture and urbanism
Eight mile cascade tunnel Great Northern Railway
Symposium of 3 papers and 2 appendices; Preliminary Studies and Results of Improving Cascade Crossing, D. J. KERR; Surveys, Construction Methods, and a Comparison of Routes, F. MEARS; Construction Plans and Methods, J. C. BAXTER; Drill-steel Sharpening Practise at West Portal, New Cascade Tunnel, H. J. KING; Pneumatic Concrete Placing Practise in the New Cascade Tunnel, H. J. KING; final record of construction of 7.79 mi. tunnel, by officials of Great Northern Railway Co., or contractors. (See also - (discussion) no. 7, Sept. 1931, pp. 1101-1104)
Eight mile cascade tunnel Great Northern Railway
Symposium of 3 papers and 2 appendices; Preliminary Studies and Results of Improving Cascade Crossing, D. J. KERR; Surveys, Construction Methods, and a Comparison of Routes, F. MEARS; Construction Plans and Methods, J. C. BAXTER; Drill-steel Sharpening Practise at West Portal, New Cascade Tunnel, H. J. KING; Pneumatic Concrete Placing Practise in the New Cascade Tunnel, H. J. KING; final record of construction of 7.79 mi. tunnel, by officials of Great Northern Railway Co., or contractors. (See also - (discussion) no. 7, Sept. 1931, pp. 1101-1104)
Eight mile cascade tunnel Great Northern Railway
Am. Soc. Civil Engrs. -- Proc
1931
86 pages
Numerous figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Eight-mile cascade tunnel great northern railway
Engineering Index Backfile | 1932
The new cascade eight-mile tunnel for the Great Northern railway
Engineering Index Backfile | 1927
The cascade tunnel: Great Northern railway
Engineering Index Backfile | 1929
Opening the cascade tunnel -- Great northern railway
Engineering Index Backfile | 1929
Discussion on Cascade Tunnel, Great Northern Railway
ASCE | 2021
|