A platform for research: civil engineering, architecture and urbanism
Buenos Aires subway 4.6 miles long built in twenty months
Report on construction of first section of Lacroze line; part of route in tunnel; vertical open-cut work; design of station in tunnel; design of tunnel section between stations; diagram of progressive operations in tunnel driving and lining; tunnel-arch forms; excavating with clay spades.
Buenos Aires subway 4.6 miles long built in twenty months
Report on construction of first section of Lacroze line; part of route in tunnel; vertical open-cut work; design of station in tunnel; design of tunnel section between stations; diagram of progressive operations in tunnel driving and lining; tunnel-arch forms; excavating with clay spades.
Buenos Aires subway 4.6 miles long built in twenty months
Eng. News-Rec
Engineering News-Record ; 106
1931
4 pages
9 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The new subway of Buenos Aires
Engineering Index Backfile | 1931
|Construction of Lacroze Subway in Buenos Aires
Engineering Index Backfile | 1930
|Buenos Aires. Buenos ayres exhibition
Engineering Index Backfile | 1930
Erinnerungslandschaft Buenos Aires
British Library Online Contents | 2010
|