A platform for research: civil engineering, architecture and urbanism
Construction of first section of Lacroze branch, 7.2 km. long, of which 3.7 km. is concrete lined tunnel.
The new subway of Buenos Aires
Die neue Untergrundbahn in Buenos Aires
Spitz, E. (author)
Bautechnik ; 9
1931
3 pages
3 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction of Lacroze Subway in Buenos Aires
Engineering Index Backfile | 1930
|Buenos Aires subway 4.6 miles long built in twenty months
Engineering Index Backfile | 1931
Buenos Aires. Buenos ayres exhibition
Engineering Index Backfile | 1930