A platform for research: civil engineering, architecture and urbanism
Methods used to stabilize highway embankments in southern New Jersey for new road; need for rigid pavements made it essential to obtain solid fills carried down to solid bottom beneath mud; dynamite found very effective; settling existing fills under traffic; salvaging damaged concrete pavement; equipment used. (See also Eng. News-Rec vol. 106, no. 17, Apr. 23, 1931 pp. 687-689, 3 figs)
Methods used to stabilize highway embankments in southern New Jersey for new road; need for rigid pavements made it essential to obtain solid fills carried down to solid bottom beneath mud; dynamite found very effective; settling existing fills under traffic; salvaging damaged concrete pavement; equipment used. (See also Eng. News-Rec vol. 106, no. 17, Apr. 23, 1931 pp. 687-689, 3 figs)
Settling swamp fills by blasting
Roads Streets
Williams, J.A. (author)
Roads and Streets ; 71
1931
6 pages
19 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Settling swamp fills by blasting
Engineering Index Backfile | 1931
|Engineering Index Backfile | 1932
Explosives for settling highway fills
Engineering Index Backfile | 1933
|Explosives for settling highway fills
Engineering Index Backfile | 1933
|Settling road embankment by underfill blasting
Engineering Index Backfile | 1933
|