A platform for research: civil engineering, architecture and urbanism
Methods used to stabilize highway embankments in southern New Jersey for new road; need for rigid pavements made it essential to obtain solid fills carried down to solid bottom beneath mud; dynamite found very effective; settling existing fills under traffic; salvaging damaged concrete pavement; equipment used. (see also Roads and Streets, vol. 71, no. 4, Apr. 1931, pp. 139-144, 19 figs)
Methods used to stabilize highway embankments in southern New Jersey for new road; need for rigid pavements made it essential to obtain solid fills carried down to solid bottom beneath mud; dynamite found very effective; settling existing fills under traffic; salvaging damaged concrete pavement; equipment used. (see also Roads and Streets, vol. 71, no. 4, Apr. 1931, pp. 139-144, 19 figs)
Settling swamp fills by blasting
Eng. News-Rec.
Williams, J.A. (author)
Engineering News-Record ; 106
1931
3 pages
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Settling swamp fills by blasting
Engineering Index Backfile | 1931
|Engineering Index Backfile | 1932
Explosives for settling highway fills
Engineering Index Backfile | 1933
|Explosives for settling highway fills
Engineering Index Backfile | 1933
|Settling road embankment by underfill blasting
Engineering Index Backfile | 1933
|