A platform for research: civil engineering, architecture and urbanism
Reading completes grade separation work at manayunk, pa
Unusual construction difficulties experienced in elevating tracks for 1 1/3 mi. through suburb of Philadelphia, Pa.; many grade crossings eliminated; engineering problems encountered; plan of track elevation work through Manayunk; profile of new and old grades; retaining walls and viaduct.
Reading completes grade separation work at manayunk, pa
Unusual construction difficulties experienced in elevating tracks for 1 1/3 mi. through suburb of Philadelphia, Pa.; many grade crossings eliminated; engineering problems encountered; plan of track elevation work through Manayunk; profile of new and old grades; retaining walls and viaduct.
Reading completes grade separation work at manayunk, pa
Ry. Age
Railway Age ; 90
1931
6 pages
10 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Grade separation -- Seattle completes 4300-ft. viaduct
Engineering Index Backfile | 1944
|Reading completes attractive station at Philadelphia
Engineering Index Backfile | 1929
New York Central Completes Grade Separation and Passenger Station Project Within City of Syracuse
Engineering Index Backfile | 1936
British Library Conference Proceedings | 1996
|