A platform for research: civil engineering, architecture and urbanism
Grade separation -- Seattle completes 4300-ft. viaduct
Traffic congestion remedied by construction of 4-lane structure crossing 4 railroad tracks and 4 arterial highways; completion handicapped and delayed by material shortages; interesting removal column forms developed by contractor.
Grade separation -- Seattle completes 4300-ft. viaduct
Traffic congestion remedied by construction of 4-lane structure crossing 4 railroad tracks and 4 arterial highways; completion handicapped and delayed by material shortages; interesting removal column forms developed by contractor.
Grade separation -- Seattle completes 4300-ft. viaduct
Western Construction News
Murray, R.M. (author)
1944
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1931
|Engineering Index Backfile | 1931
|Grade separation viaduct built of treated wood
Engineering Index Backfile | 1937
Build double-deck concrete viaduct to bypass Downtown Seattle
Engineering Index Backfile | 1951
Concrete trusses and 47-ft. Flat slabs in new Seattle viaduct
Engineering Index Backfile | 1931
|