A platform for research: civil engineering, architecture and urbanism
Four-mile line requires three million yards of fill
Modern grading methods utilized on large scale to place 3,000,000 cu. yd. of embankment required in line-relocation project near Chillicothe, Ill.; project also includes new bridge over Illinois River and four grade-separation structures; plan of river crossing and elevation of new bridge; dredging operations; plan and profile of change of line; concreting facilities; four grade-separation structures. (See also Ry. Age vol. 90, no. 14, Apr. 4, 1931 pp. 671-675, 6 figs)
Four-mile line requires three million yards of fill
Modern grading methods utilized on large scale to place 3,000,000 cu. yd. of embankment required in line-relocation project near Chillicothe, Ill.; project also includes new bridge over Illinois River and four grade-separation structures; plan of river crossing and elevation of new bridge; dredging operations; plan and profile of change of line; concreting facilities; four grade-separation structures. (See also Ry. Age vol. 90, no. 14, Apr. 4, 1931 pp. 671-675, 6 figs)
Four-mile line requires three million yards of fill
Eng News-Rec
Engineering News-Record ; 106
1931
2 pages
2 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Four-mile line requires three million yards of fill
Engineering Index Backfile | 1931
Slide at Fort Peck dam moves eight million yards of fill
Engineering Index Backfile | 1938
Slide at Fort Peck dam moves eight million yards of fill
Engineering Index Backfile | 1938
Million yards concrete for dam
Engineering Index Backfile | 1943
80-wagon fleet moves million yards per month
Engineering Index Backfile | 1947
|