A platform for research: civil engineering, architecture and urbanism
Four-mile line requires three million yards of fill
Modern grading methods utilized on large scale to place 3,000,000 cu. yd. of embankment required in line-relocation project near Chillicothe, Ill.; project also includes new bridge over Illinois River and four grade-separation structures; plan of river crossing and elevation of new bridge; dredging operations; plan and profile of change of line; concreting facilities; four grade-separation structures. (see also Eng. News-Rec., vol. 106, no. 9, Feb. 26, 1931, pp. 364-365, 2 figs)
Four-mile line requires three million yards of fill
Modern grading methods utilized on large scale to place 3,000,000 cu. yd. of embankment required in line-relocation project near Chillicothe, Ill.; project also includes new bridge over Illinois River and four grade-separation structures; plan of river crossing and elevation of new bridge; dredging operations; plan and profile of change of line; concreting facilities; four grade-separation structures. (see also Eng. News-Rec., vol. 106, no. 9, Feb. 26, 1931, pp. 364-365, 2 figs)
Four-mile line requires three million yards of fill
Ry Age
Railway Age ; 90
1931
5 pages
6 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Four-mile line requires three million yards of fill
Engineering Index Backfile | 1931
Slide at Fort Peck dam moves eight million yards of fill
Engineering Index Backfile | 1938
Slide at Fort Peck dam moves eight million yards of fill
Engineering Index Backfile | 1938
Million yards concrete for dam
Engineering Index Backfile | 1943
80-wagon fleet moves million yards per month
Engineering Index Backfile | 1947
|