A platform for research: civil engineering, architecture and urbanism
Notable performance in emergency levee building
In Vicksburg Engineer District, four tower excavators with supplementary tractor wagon-grader outfit built 6 mi. (3,428,956 cu. yd.) of full-section levee in 5 months.
Notable performance in emergency levee building
In Vicksburg Engineer District, four tower excavators with supplementary tractor wagon-grader outfit built 6 mi. (3,428,956 cu. yd.) of full-section levee in 5 months.
Notable performance in emergency levee building
Eng. News-Rec
Jackson, T.H. (author)
Engineering News-Record ; 106
1931
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1916
|Levee Design and Emergency Response
British Library Online Contents | 2006
|Engineering Index Backfile | 1902
|Levee building at Lake Okeechobee
Engineering Index Backfile | 1934
Levee building by hydraulic dredge
Engineering Index Backfile | 1929