A platform for research: civil engineering, architecture and urbanism
Construction starts soon on Hoover Dam
Contract for construction was let on Mar. 11; project will be constructed in Black Canyon, on Colorado River, and will comprise dam 730 ft. high, that will form storage reservoir of 30,500,000 acre ft. with power plant of 1,000,000 hp. installed capacity; rock and earth cofferdams; map showing Colorado River basin and location of project; discharge of Colorado River tributaries.
Construction starts soon on Hoover Dam
Contract for construction was let on Mar. 11; project will be constructed in Black Canyon, on Colorado River, and will comprise dam 730 ft. high, that will form storage reservoir of 30,500,000 acre ft. with power plant of 1,000,000 hp. installed capacity; rock and earth cofferdams; map showing Colorado River basin and location of project; discharge of Colorado River tributaries.
Construction starts soon on Hoover Dam
Power
Power ; 73
1931
5 pages
6 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction starts soon on Muskingum flood-control dams
Engineering Index Backfile | 1934
|Engineering Index Backfile | 1933
|Engineering Index Backfile | 1932
|Engineering Index Backfile | 1932
|Engineering Index Backfile | 1933
|